{"id":1038,"date":"2020-07-24T07:41:36","date_gmt":"2020-07-24T07:41:36","guid":{"rendered":"http:\/\/nbs.grandem.lv\/work\/atskaites-projekts-2020\/"},"modified":"2020-10-06T09:03:38","modified_gmt":"2020-10-06T09:03:38","slug":"boslaan","status":"publish","type":"work","link":"https:\/\/nbs.lv\/en\/work\/boslaan\/","title":{"rendered":"Family house Boslaan"},"content":{"rendered":"<p><strong>Project Capacity<\/strong>: 1360 m<sup>2<\/sup> of elements.<\/p>\n<p><strong>Location<\/strong>: Boslaan, Netherland<\/p>\n<p><strong>Building type<\/strong>: Timber frame family house.<\/p>\n<p><strong>Production type<\/strong>: Exterior, interior walls, intermediate-floor divisions, roof elements, terrace elements, garage constructions.<\/p>\n<p><strong>Stages completed<\/strong>:<\/p>\n<ul>\n<li>Design structures development of technical assembly project;<\/li>\n<li>Production;<\/li>\n<li>Delivery;<\/li>\n<li>Assembly;<\/li>\n<li>Exterior finishing works.<\/li>\n<\/ul>\n<p><strong>Commissioning Date<\/strong>: april 2020 &#8211; may 2020<\/p>\n<p><strong>Project Contractor<\/strong>: Barentsz Ontdekkingshuizen, Netherland<\/p>\n","protected":false},"featured_media":1026,"template":"","class_list":["post-1038","work","type-work","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nbs.lv\/en\/wp-json\/wp\/v2\/work\/1038","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nbs.lv\/en\/wp-json\/wp\/v2\/work"}],"about":[{"href":"https:\/\/nbs.lv\/en\/wp-json\/wp\/v2\/types\/work"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nbs.lv\/en\/wp-json\/wp\/v2\/media\/1026"}],"wp:attachment":[{"href":"https:\/\/nbs.lv\/en\/wp-json\/wp\/v2\/media?parent=1038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}